ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) FOR BATOKA GORGE 2400 MW HYDROPOWER PROJECT.
The Environmental Management Agency received the Environmental and Social Impact
Assessment (ESIA) for the proposed Batoka 2400 MW Hydro Power Project in terms of
Section 100 of the Environmental Management Act (CAP 20:27). Hydro Power Schemes
are prescribed projects in terms of Section 97 as read with the First Schedule of the
Environmental Management Act (CAP 20:27), thus require an ESIA study to be conducted,
and issuance of an ESIA certifi cate before the project commences. As part of the review
process, the Public is therefore being notifi ed of the submission of the above proposed
project for review in terms of Section 100 of the Environmental Management Act (CAP
20:27) as read with Section 10(7) of Statutory Instrument 7 of 2007.
SUMMARY OF BATOKA GORGE HYDRO-ELECTRIC SCHEME (BGHES) PROJECT
The proposed BGHES project will be located in the central portion of the Zambezi River
Basin and will span across the international boundary between Zambia and Zimbabwe. The
proposed Hydro Power Plant is expected to generate 2400 MW Power. In Zimbabwe, it will
be situated on the Zambezi River and approximately 47 km downstream of the Victoria Falls
in Hwange District covering Matetsi, Chidobe, Katchecheti, Nemanhanga, Mbizha, Jambezi,
Sidinda, Mashala and Simangani Wards. In Zambia, it covers parts of the Kazungula District
in Mukuni and Katapazi Wards.
The proposed BGHES includes the following key components;
The Full ESIA report is accessible on the following link:
https://www.zambezira.org/hydro-electric-schemes/batoka-hes-project
The Agency therefore invites comments from the Public as part of the review process on the proposed project to be emailed to batoka.esia@ema.co.zw on or before 17 October 2022.
For more information contact us on;
ENVIRONMENTAL MANAGEMENT AGENCY (EMA)